05.22.2026

OJSC “Ala-Too Resort”, together with the Austrian companies INPUT and Doppelmayr, is preparing for the start of construction of the “Ak-Bulak” resort town.

As part of the second phase of the state project “All-Season Mountain Cluster ‘Ala-Too Resort’,” preparations are underway for the commencement of construction works at the “Ak-Bulak” resort town.

Currently, specialists of OJSC “Ala-Too Resort,” together with experts from the Austrian companies INPUT and Doppelmayr, are conducting on-site working visits in the territory of the future resort town.

A comprehensive assessment of the area is being carried out, and the main directions for further design and infrastructure development are being determined.

In addition, specialists from INPUT and Doppelmayr will develop and prepare the concept of the future “Ak-Bulak” resort town as part of the overall master plan of the project.



Back